otarafa: pokemon butarafa: Beijing 2008 Preparations - Three Weeks to Go
Magdeburg Water bridge

cevap ver  qwerty   22/07/08

nasil yani ?

It’s 918 meters,
completed in October
2003. Construction
began in 1997, and
after six years and
around half a
billion euros, the
gigantic water
bridge connects
Berlin’s inland
harbor with the
ports along the
Rhine river. The
huge tub created to
transport ships over
the Elbe took 24,000
metric tons of steel
and 68,000 cubic
meters of concrete
to build.


Keywords:nasil yani ?
Kategori: sayfa
cevap ver  loop   22/07/08
nasılımı kalmış güzel kardeşim


boşlukları doldurun


bunlara da göz atabilirsiniz:

otarafa: pokemon butarafa: Beijing 2008 Preparations - Three Weeks to Go

iletişim - şikayet - kullanıcı sözleşmesi - gizlilik şartları