Magdeburg Water bridge
|
It’s 918 meters,
completed in October 2003. Construction began in 1997, and after six years and around half a billion euros, the gigantic water bridge connects Berlin’s inland harbor with the ports along the Rhine river. The huge tub created to transport ships over the Elbe took 24,000 metric tons of steel and 68,000 cubic meters of concrete to build. |
|